Product Detail :
|
Proposed laying and linking of BG track, assembling and insertion of points & crossings,SEJs , leading and dumping of stone ballast, dismantling stewing of existing track and points and crossing SEJs and GJs stc. supplying, leading and dumping st]one ballast dismantling and slewing of existing track points and crossing earthwork in formation, blanketing, construction of new station building minimum passenger amenities and execution of other miscellaneous works for new byepas 1 consultancy services for devrlopmrnt and preperation of GADS detailed project report preparation of detailed drawing and design for formation , sub-structuresand superstructure of toad over bridge including vidauct spans and approches, design of reinforced earth wall and retaining wall Proof checking of Foundation, Structural and RE wall/ Retaining Wall Design; Preparation of BOQ Preparation of Detailed Estimate; Conducting Final Location survey; Preparation of Land Acquisition Proposals; Conducting Geotechnical investigation and preparation 1 Consultancy services for Development and preparation of GADs; detailed project report, Preparation of Detailed Drawings and Design for Foundatin, Sub-structure & Superstructure of Road over bridge/Road under Bridge including viaduct spans and Approaches; Design of Reinforced Earth wall & Retaining wall; Proof checking of Foundation, Structural and RE wall/ Retaining Wall Design; Preparation of BOQ Preparation of Detailed Estimate; Conducting Final Location survey; Preparation of Land Acquisition Proposals; Conducting Geotechnical investigation and preparation of Bid Document with Technical specifications as per relevant codes/ Manuals for Construction of ROBs 1 Carrying out repairs to Signalling maintenance assets in Sub division of ADSTE/VKB section on SC Division for a period of 12 months 1 Signalling arrangement in connection with proposed construction of Bridge Signalling arrangement in connection with proposed construction of New Bridge Signalling arrangement in connection with proposed construction of LHS for staff of ELS to reach ELS/KZJ under Sr.DEN/CentraWSC Section Signalling arrangement in connection with proposed construction of New bridge 1 Proposal for provision for extension for provision of additional water way for the exg Bridge no.283 with 4X5.OX1.50m (Actual size or RCC box on UP & DN lines by open cut & RH girder method and lowering of the bed by 622m m. 5. KZJ-BPQ section Signalling arrangements in connection with Proposed for rebuilding of (1) bridge No192up at Km220/1-219/29 between ASAF-RLW section. (2) Bre No53 SL at Km.24.865 of PRPI-GDCR section
|