Product Detail :
|
Providing project supervision services (pss) at various construction sites/sections 1 construction organization- final location survey for proposed construction of 3rd line between wadi and secunderabad stations 1 fixing of alignment, pegging out centre line, taking levels, finalization of land requirement (survey number wise), soil investigations, geotechnical investigations for bridges by drilling bore holes, collecting samples, calculation of water way requirement for all the proposed bridges and preparation of gads for bridges, station yards, project sheets and preparation of detailed estimate and all other connected drawings etc. with different survey works requiring to be carried out 1 construction organization- final location survey for new bg line between dornakal and miryalaguda stations (120.00 kms) fixing of alignment, pegging out centre line, taking levels, finalization of land requirement survey number wise, calculation of water way requirement for all the proposed bridges, soil investigation for bridges, preparation of gads for bridges, station yards, project sheets, 1 proposed construction of superstructure portion of rob in lieu of lc no. 14 at km 342/19-21 as lx54.oom (rdso standard span) bow string steel girder + lx24.oom (rdso standard span) composite girder for 4-lanes between uppal and jammikunta stations 1 appointment of authority engineer for providing project management services for construction of 3rd line between nekonda (excluding) and dornakal junction (excluding) (52.30 km) including electrification and signaling works 1 repairs to hand railing of br.no.1017 up & dn 1 repairs to foot paths of bridges.
|