Product Detail :
|
Furnishing of labs in AB-/extension building (4D) 1 Supply and installation benches, fume hoods, student sitting furniture and services like exhaust system, gas piping etc 1 Outsourcing of various Job Works/Tasks on Work Contract Basis through Deployment of Manpower and Supervision at work spots of the Institute Works 1 Improvement of surrounding areas behind all the messes by leveling dressing placing grass paver blocks etc. including the supply and installation of Porta Cabins at the back side of all messes 1Full comprehensive annual maintenance and periodical maintenance of Johnson make lifts installed in various buildings 1 Supply, installation, testing & commissioning of split ACs for 102 CIF & annex area 1 Rearrangement of additional power points and data points for 106 and 107 (Physics Department) of 4D Building and EES lab (Lab. No. 210) of Therm Building.
|