Product Detail :
|
Desiltation of upper rampur khal from ch. 6.00 km to ch. 19.50 km along with bank protection at different ncb122-231fm•24 reaches & raising and strengthening of both banks of an offshoot channel of river mundeswari for a length of 5.75 km including construction of a steel bridge over lower harinakhali khal at ch. 10.594 km
|