Product Detail :
|
Auction Sale of Pway Scrap (null) - Scrap Rail 52 Kgs. Remarks - Kachcha /pakka Road Available. Delivery During All Seasons. No Wear and Tear Has Been Provided for Any Scrap Rails. Delivery Will Be Made on Sectional Weight Per Meter Basis Only. Quantity is Physically Available. Lot No. Has Been Painted on the Lot. Actual Measurement Painted on Each Rail in Meter. Cutting of Rail Above 6 Meters is Allowed for Easy Transportation. Stockholder Will Be Fully Responsible for Any Addition, Deletion, Alteration and Variation Comes in the Lot After Joint Lot Inspection. Dunnage for Stack I Are Not Included in Lot and Not to Be Delivered. Dunnages for Stack Ii and Stack Iii Are Included in Lot and to Be Delivered as Per Measurement in Ss-11. Fist Plates/joggle Fish Plates/glued Joints and Other Fittings Are to Be Returned to the Stockholder. the Quantity as Per Ss11 Has Been Amended to 80.373 Mts From 80.461 Mts and R/m to 1545.63 R/m From 1547.32 R/m. Sse (p.way) Tuh Will Make Necessary Corrections in Quantity and R/m on Tms. Since It is a Yard Similar Rails Are Lying Nearby Lot and Under Lot Formation. Care Should Be Taken That the Same is Not Delivered. the Quantity and R/m as Per D.o. and Measured Rails as Mentioned in Ss-11 Only to Be Delivered. 1 Crossing, 2 Tongue Rail, 1 No 60 Kg, 2 New 52 Kg Are Lying Near Stack Not in Lot and Not to Be Delivered. 1 Mixed Stack of 52/60 Kg Are Lying Near Km 46/3a Not in Lot and Under Lot Formation. Delivery Involves Crossing of One Line for Stack I and Three Lines for Stack Ii and Iii Ballast Siding Line. All Precautions to Be Taken By the Purchaser During Loading of Rails By Hydra/labour. No Claim Will Be Entertained After Sale of Lot. the Purchaser Shall Be Responsible for Any Loss Or Damage to Any Other Railway Property/facility/equipment. Whether Due to His Negligence Or Otherwise and Safety of His Labour and Other Staff in Railway Premises During the Process of Cutting and Loading of Rails. Lot is Ok for Sale on Above Observations.
|
Tender Detail : |
Tender Submission & Opening Dates Are Undefined in the Tender. for Further Details, You Have to Contact the Government Department Or Check Tender Document and Image File. |