Product Detail :
|
Development and maintenance of (i). beawar masuda goyala section of sh 26a (length 66.77 km); (ii). arain sarwar section of sh-7e (length 44.260 km) & (iii). laxmipura dora dabiranaji ka gudha section of sh-115 (length 49.60 km); (total length 160.630 km) through public private partnership (the “ppp") under design, build. operate/maintain & transfer (the “dbot hybrid annuity”) basis;
|