Product Detail :
|
Supply of bogie bolster arrgt.to drg. no. icf/mrvc/m-0-4-001/col.i, alt "l" and rdso specn.c-9202, rev.02. the firm shall fulfil the requirements as per icf/ md/specn.147, issue status 01, rev-02 with amd no 01. items shall be suitably packed to avoid ingress of water in center pivot housing and spigot housing. threaded air connection at bolster end shall be closed. biodegradable plastic/ wooden covers may be used for closing. all machined areas shall be coated with grease (lithium based) before packing. safety item special condition paint scheme shallbe as per drg. firm to supply the bogie bolster with suitable packing so that the bogie bolster parts like cp pin housing, side bearing flange, damper bracket , reservoir bracket,levelling valve fixing bracket and spigot housing are not damaged during transportation /handling / storage. bogie bolster arrgt.to drg. no. icf/mrvc/m-0-4-001/col.i, alt "l" and rdso specn.c-9202, rev.02. the firm shall fulfil the requirements as per icf/md/specn.147, issue status 01, rev-02 with amd no 01. items shall be suitably packed to avoid ingress of water in center pivot housing and spigot housing. threaded air connection at bolster end shall be closed. biodegradable plastic/wooden covers may be used for closing. all machined areas shall be coated with grease (lithium based) before packing.safety item special condition paint scheme shallbe as per drg. firm to supply the bogie bolster with suitable packing so that the bogie bolster parts like cp pin housing, side bearing flange, damper bracket , reservoir bracket,levelling valve fixing bracket and spigot housing are not damaged during transportation /handling /storage. [warranty period 30 months after the date of delivery ]
|
Tender Detail : |
bogie bolster arrgt.to drg. no. icf/mrvc/m-0-4-001/col.i, alt "l" and rdso specn.c-9202, rev.02. the firm shall fulfil the requirements as per icf/ md/specn.147, issue status: 01, rev-02 with amd no: 01. items shall be suitably packed to avoid ingress of water in center pivot housing and spigot housing. threaded air connection at bolster end shall be closed. biodegradable plastic/ wooden covers may be used for closing. all machined areas shall be coated with grease (lithium based) before packing. safety item special condition : paint scheme shallbe as per drg. firm to supply the bogie bolster with suitable packing so that the bogie bolster parts like cp pin housing, side bearing flange, damper bracket , reservoir bracket,levelling valve fixing bracket and spigot housing are not damaged during transportation /handling / storage. |